You don't have javascript enabled. Good luck with that.
Pencarian
 Kolam Olakan di Jelambar Sudah 60 Persen

Stilling Basin Construction in Jelambar Reaches 60 Percent

The progress of stilling basin construction work on Jalan Satria Raya, Jelambar, Grogol Petamburan which carried out by West Jakarta Water Resources (SDA) Sub-agency has reached 60 percent.

We build this stilling basin to minimize inundation in Jelambar Urban Village

Grogol Petamburan SDA Unit Head, Agus conveyed, this stilling basin with length 5.5 meters, width 1.5 meters, and height 3 meters is expected to accommodate water with volume up to 25 qubic meters.

"We build this stilling basin to minimize inundation in Jelambar Urban Village," he explained, Friday (11/20).

SDA Accelerates Stilling Basins Construction in Kelapa Gading

For the construction, his side deployed 25 personnel from Grogol Petamburan SDA Unit.

Anticipating inundation and flood in the area, his side not only built stilling basin, but also prepared water pump that can drain the water to Grogol River.

"We estimate to finish building this stilling basin by the end of November," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1157 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye995 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye952 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye729 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye629 personAnita Karyati